RFIs
Submittals
Drawings
Specifications
Documents
How to use Procore
RFIs
Do we have any RFIs on the elevator sump pit?
What RFIs have been asked regarding the exterior siding?
Where is the fire protection RFI?
What RFIs are related to fume hoods?
What RFIs have been asked about the brick work?
Is there an RFI on the window film?
What RFI changed window size?
What RFIs have affected exterior corridor topping slabs?
Which RFI relates to the ATS pad?
Please summarize the response to RFI 67.
Are there any RFIs that reference engine exhaust?
How many overdue RFIs are there?
What RFIs are due in the next 7 days?
Which RFIs have cost associated with them?
What is the most recent RFI?
Count the number of RFIs created on July 19th.
How many RFIs are assigned to me?
Which RFI manager has the most RFIs?
Submittals
What is the size of the hepa filter for the cleanroom air shower?
How much attic stock was indicated in the bamboo flooring submittal?
What is the most recent submittal with shop drawings for electrical work?
What is the casing spacer made of in the utility accessories submittal?
What type of windows are used on our project?
What submittals pertain to the roof walking mats?
What is the submittal type for natural gas distribution?
Which specialty contractor submitted the LED exterior lighting?
How much attic stock is required for tile carpeting?
What does the submittal for cable trays indicate about fire rating?
Does flooring system have any open submittals for their ceramic tile?
Are the common area casework shop drawings approved?
Is the ceramic tile submittal currently open?
How long of a warranty was indicated in the door hardware submittal?
Which submittals are in [user name] ball in court?
How many submittals were approved last month?
Drawings
How many large offices are on the third floor in drawing A132?
What discipline is the Third Floor - Reflected Ceiling Plan drawing under?
What is the elevation in the exterior elevation drawing on the south side of level 3?
What is the ADA mounting height of the changing bed?
What is the abbreviation for the expansion joint in the general information drawing?
What is the square footage of the mechanical penthouse?
What is the drawing number for the third floor dimension plan?
How many square feet is the women's restroom in drawing a112?
What is the fire rating for solid wood and glass for door 15?
Specifications
What is the required insulation thickness for copper pipe in the specifications?
Which specifications require third party testing?
What specs require owners training?
What are the warranty requirements for the emergency generator?
Are the maintenance procedures listed for the elevator system in Specifications?
What product do we need to use to clean the countertops, per the Submittals?
Which sections of the Specifications cover sitework and landscaping?
What is the recommended installation procedure for the carpet?
Can you show me the roof hatch specification requirements?
How many shop drawings are we required to submit for review?
Which Specification section includes air coils?
What are the warranty requirements for the door hardware?
What are the required closeout documents for coiling doors?
Documents
Who are the subcontractors in the Emergency Room compliance report?
What is the term of warranty for the final finishes?
What was the description of the incident that occurred on 6/1/24 in the incident report?
What is the owner-builder declaration for this project?
Where is the application for the building permit?
How to Use Procore
How do I create a Submittal package?
How can I change or reset a password?
How do I create locations in Procore?
How do I apply markups from a previous revision to a new Drawing revision?
How can I create an RFI revision?
What does "mark official" do in RFIs?
How do I publish an RFI in the Drawings tool?
How do I change permissions for an RFI?
What is a typical workflow for change orders?
How do I add someone to the Directory?
How do I grant granular permissions for a project?
How to submit a bid in Procore?
How do I create a submittal?
Where do I upload drawings?
How do I submit a new subcontractor invoice?