Duplicate a Submittal

Objective

To duplicate an existing submittal using the Project level Submittals tool.

Things to Consider

  • Required User Permissions:

    • To create a duplicate for a submittal that you created:* 'Read Only' or 'Standard' level permissions on the project's Submittals tool with the 'Create Submittal' granular permission enabled on your permissions template.
      OR* 'Standard' level permissions on the project's Submittals tool without a permissions template assigned to you.

    • To create a duplicate of any submittal:* 'Admin' level permissions on the project's Submittals tool.

  • Additional Information:

    • Submittals can only be duplicated within the same project.

    • Submittals cannot be duplicated in bulk.

Steps

  1. Navigate to the project's Submittals tool.
    This reveals the Submittals page.

  2. In the Submittals log, locate the desired submittal. Then click View.
    This opens the submittal in view mode.

  3. Click the vertical ellipsisicon-ellipsis-vertical.png, then click Duplicate Submittal. This opens the 'New Submittal' page.
    Scroll to the 'General Information' area and note that all of the general information from duplicated submittal is inherited.

  4. Revise the following submittal information as needed:

    • Calculate Submittal Schedule Information (If Enabled)

      Submittal Schedule Calculations is an optional feature that you can enable. See Enable Submittal Schedule Calculations. When enabled, the Submittals tool will analyze your entries in the 'Required On-Site Date', 'Lead Time', 'Design Team Review Time', and 'Internal Review Time' fields to provide suggestions for the Submitter and Approver 'Due Date' on the submittal workflow. It also automatically populates the 'Planned Return Date', 'Planned Internal Review Completed Date', and 'Planned Submit By Date' fields.

      1. Follow the steps in Create a Submittal.
        This reveals the New Submittal page.

      2. Scroll down to the Submittal Schedule Information area.

      3. Set the following information:

        1. Schedule Task. The schedule task associated with the submittal being created. A schedule must be uploaded to the project first. See Upload a Project Schedule File to Procore's Web Application.

        2. Note: If you enter 7, the system subtracts '7' calendar days from the Planned Return Date to automatically populate the date entry for the Planned Internal Review Completed Date.

        3. Note: If you enter 10, the system subtracts '10' calendar days from the Required On-Site Date to automatically populate the date entry for the Planned Return Date.

        4. Note: If you enter 5, the system subtracts '5' calendar days from the Planned Internal Review Completed Date to automatically populate the date entry for the Planned Submit by Date.
          This illustration shows you an example of these entries and calculations.

          create-submittal-schedule-info.png

      back to steps

      Update the Delivery Information

      • Anticipated Delivery Date
        View the date displaying in the Anticipated Delivery Date. This is the date between the 'Lead Time' and when the submittal was distributed, and it will not populate upon the creation of the submittal. This date is calculated by Procore once the submittal has been distributed. See Distribute a Submittal.​​

      • Schedule Task
        If you have enabled the Schedule tool on the project and integrated an Asta Powerproject, Microsoft Project, or Oracle Primavera schedule with Procore, you are permitted to select a project task from the Schedule Task drop-down list when you have a user account that has been granted 'Read-Only' level permission or higher on the Schedule tool. This is for reference only.

      • Confirmed Delivery Date
        Select the date the subcontractor or supplier confirmed the freight would arrive using the Confirmed Delivery Date calendar.

      • Actual Delivery Date
        Select the date the material arrived on site using the Actual Delivery Date calendar. Typically, this value is updated by the project superintendent.

      back to steps

      Apply a Submittal Workflow Template

      A user with 'Admin' level permission to your project's Submittals tool can create one (1) or more submittal workflow templates which you can then to a new submittal when you first create it. This saves data-entry time by preventing you from having to add a new submittal workflow each time you create a submittal.

      1. Under Submittal Workflow, do the following:

        submittal-workflow-add-template.png

        1. Select a Template. Select a workflow template from the drop-down list.
          Notes:

          • This drop-down list is only visible and available to users with 'Admin' level permission on the Submittals tool.

          • This action applies the person(s) named on the submittal workflow template to your submittal.

          • To learn how submittal workflow templates are created, see Manage Submittal Workflow Templates.

      2. Continue by modifying the Name, Role, and Days to Submit/Response fields as needed for the submittal. Your changes only affect the workflow on the submittal, your changes do NOT affect the submittal workflow template.

      3. (Optional) Continue with the steps in Add Users to the Submittal Workflow.

      Add Users to the Submittal Workflow

      1. Under Submittal Workflow, do the following for each desired line item in the submittal:

        • Name. Start typing a project user's name in the Search box. Then select the appropriate user from the list.* If you want to require a response from the user, place a mark in the checkbox next to their name.
          OR* If you do NOT want to require a response from the user, remove the mark from the checkbox.
          Note: If you are adding more than one user to a parallel approval workflow group, the Ball In Court Responsibility will shift to the next workflow group after all of the people marked required in the group submit a response to the submittal.

        • Role. Select Approver or Submitter from the list. See What is the difference between a submitter and approver in submittals?
          Notes:* To be designated as an approver, the person must exist in the Project level Directory tool (see Add a User Account to the Project Directory) and must also be granted 'Admin' or 'Standard' level permissions to the Submittals tool (see Set User Permissions for the Submittals Tool).* If you are a user with 'Standard' level permissions to the Submittals tool, you can only add users with 'Admin' level permissions to the workflow.* If you plan to add a Submitter to the submittal, we recommend that you designate a Submittal Manager as the first approver in the submittal's sequential approval workflow. This gives the Submittal Manager an opportunity to ensure the submittal is thoroughly reviewed by your internal stakeholder before it is sent to the users in the next step on the submittal workflow.* If you are a user with 'Admin' level permissions to the Submittals tool, you can add users with either 'Admin' or 'Standard' level permissions to the workflow.
          Note: If you want the submittal workflow to use sequential approval, add only one user to each line item in the workflow. If you want a step in the submittal workflow to use parallel approval, add two or more users to a line item.

        • Due Date. Select a date from the calendar for the submittal response to be due.
          Note: The 'Due Date' field is automatically populated based on the default number of days specified on the Submittals tool's Configure Settings page. See Configure Settings: Submittals Tool. The due date also respects which days are set as 'working days' for the project. See Set Project Working Days.

      2. Click Add Step.

      3. Repeat these steps to add another user to the workflow.

      4. If you want to change the order of the workflow steps, do the following:

        1. Grab the line item by the vertical grip (⋮⋮).

        2. Use a drag-and-drop operation to move the line item into the desired order.

          submittals-change-order-table.png

      Update and Send the Submittal for Review

      When finished with the steps above, choose one of these options:

      • To save your changes without sending an email to members of the submittal workflow, distribution list members, and submittal manager, click Create.
        OR

      • To save your changes and to send an email notification to alert the members of the submittal workflow and to alert the members of the distribution list, click Create & Send Emails.